Willkommen? senden Sie eine Grafik oder ein Muster, und wir werden ein Angebot erstellen.

Manufacturing

One plant in Tianjin,
from drawing to shipping carton

Research, tooling, assembly and testing sit in the same building. That is what makes a design revision take days instead of a shipping cycle — and it is why we can answer a technical question without forwarding it to someone else.

The plant, in numbers

Everything here is something you can ask us to evidence. If a number is missing, we would rather leave the space empty than print one we cannot back up.

10yrs
research and manufacturing
OEM·ODM
private label and custom design
1plant
start to finish, one site

What happens where

Grouped the way an audit walks the building, not the way a catalogue is organised.

The site

One address for engineering, tooling, assembly, testing and dispatch — the four steps below do not travel between suppliers.

Production

Assembly cells and test stations on the same floor as the engineers who designed the product.

Quality control

Incoming inspection, in-process checks and a final outgoing test on every unit — not a sample pulled from the pallet.

R&D and tooling

Structure, electronics and packaging designed in house; prototypes built before a production run is quoted.

How a custom project runs

The same five steps whether it starts from your drawing, a competitor sample or a written specification.

  1. 01

    Brief

    You send a drawing, a sample, a specification — or a description of the problem the device has to solve.

  2. 02

    Design and DFM

    Our engineers work it into something manufacturable and come back with the compromises, the cost drivers and a quotation.

  3. 03

    Prototype

    One or a few units built and shipped to you. Fit, noise, heat, finish — checked by hand, not on paper.

  4. 04

    Approval and tooling

    Nothing goes to tooling until you have signed off the prototype. Changes after tooling are the expensive kind.

  5. 05

    Production and dispatch

    Pilot run, then the full run with outgoing inspection and the paperwork for your market in the carton.

Third-party audit reports

Independent assessments of the site, downloadable in full. Send them to your own compliance team before you ask us anything.

Ask us for the current audit and assessment reports for this site. We send the documents themselves, not a badge.

Ask for the evidence, then decide

Tell us the model or the market you are working on and we will send the documents that apply to it — certificates, test reports, audit reports, packing data.